Thursday, April 9, 2009

Day 9

Morning
After the maintenance meeting, we had a small meeting with Jim, Ladd, and Dean about stirring coil standardization. I talked to Tony about the work that I had done on S8 and the pump procedure for VAR 13 yesterday. He agreed with my choice of an alarm at minimum flow, and shutdown just below one pump flow. We had the monthly engineering meeting at 11. It was mostly a discussion of the budget. The engineering staff went to lunch at Humpty's Dump afterword.

Afternoon
Worked on my two projects more in the afternoon. Borrowed the camera from Dean and took pictures of the cooling setup above 13. Edited the procedure document to include those and the changes that Tony and I discussed. I grabbed the shop laptop and edited the S8 program as well. Added some control for gun 1, but I'm not sure it will work as I expect.