Morning
I came in and got to work on the Tobin test bench. I asked Tony about the analog trip setting, which prompted a long examination of the board and the input signals. I think what we determined was that we should just use one channel (phase) to trip the board and you may need to multiply by 3^(1/2) for a correction factor. I also muddled around my desk a little and cleaned up a few small things on projects. I got a call in from Frank Susnik that my drawings are approved, so I got Tony and Matt to sign off so they can get into the system.
Afternoon
The entire afternoon was spent up in plant engineering talking with Frank Davis about the old bliss press project. I actually contributed a small amount when it came to the panel because I had been involved with the previous discussion some months ago. I didn't really say too much, but I did observe and learn some. When we got back (Dean included), I emailed off the final prints and called it a week.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment