Thursday, May 14, 2009

Day 34

Morning
Tim wanted a layout of what is already out at the Old Bliss panel for a contractor. I went out and got the button configuration, but I couldn't find any drawings. Tony has a booklet on his desk that came from that project upgrade, and it had everything I needed. I made copies and then scanned them in. I emailed that back, and didn't hear anything back so far. I also finished the theory of operation document for EBW 1 and 5. That program is much harder to describe because a lot of the practices don't make much sense.

Afternoon
I went out on the floor and traced out the vacuum schematics of EBW 1 and 5 to make sure the matched up with the prints that I have. Other than the missing jet, everything is the same. I came back in and proof read my draft, then looked over the things I had left to do.

No comments:

Post a Comment