Friday, June 12, 2009

Day 55

Morning
There was an issue with a motor down in the pumphouse. One of the cold well pumps would indicate that it was running when it was actually off due to a device net issue. We spent some time looking at it up in the control room, then down in the pump house. There was also an issue with S9 and an argon bottle interlock, but we didn't have the time to go get that fixed. I went to the monthly engineering meeting which was about the budget.

Afternoon
There was a fall protection class that I supposed to go to, but with only one in attendance he canceled it. Came back and got a little done on the welder with Tim's new program. All of the PID controls should be better now, but we won't know until we get some time to test it out for real.

No comments:

Post a Comment