Morning
Lots of little things to take care of before Tony left for a wedding. Had an SI08 meeting for EBW 4. No big action items resulted from that. There were some talk about the new furnace (S11) and what kind of massive job it will be. We ran across the street and threw a bit into S9 to fix the argon bottle issue. The fix was very clever. There is a lock-in bit over a push button in one rung. Tony dropped the argon bit into that rung. When the bottle goes dry, the bit will turn off leaving only the push button to start the gun back up.
Afternoon
Tobin stopped by and asked a few questions so we took a look at the HPM press. When they serviced the hydraulics they left a few pistons up that were causing a lock out. Tobin pushed them down only to find that the lines are hooked up backwards now. It did fix the problem. Tony took off for his sister-in-law's wedding. I took a look through a controls book and fixed up some small things before taking off for the week.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment