Morning
It was really hot today. I started out by getting together a few things on my cost doc. I added in the new part quotes from NCE to the parts sheet. Rich gave me a call to get a status update on things. Tony and I went across the street to talk S7 before the plant engineering meeting. I sat in on that one, but it was mostly a small review of budgetary items. Tim went into detail about his electrical quotes. The mechanical quotes are less refined, but they are getting there. After the meeting, we talked with Rich about gun physics and Wah Chang things.
Afternoon
I called down to the instrument shop to get a price on the API action packs. I didn't get a number, $350, until the very end of the day. I also emailed out the new fiber plan to Craig Tibbs. The Q2 review was this afternoon down in the visitor's center. I caught a ride with Dean and sat in on that. It sounded like Matt didn't have a great quarter by his own admission.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment